FORM P-1
RINCIAN PEKERJAAN PER SATUAN KERJA/SATUAN KERJA SEMENTARA
UNIT ORGANISASI : DIREKTORAT JENDERAL BINA MARGA
STATUS : 16 December 2008
 
Kode dan Nama Satuan Kerja/ Sementara : 496199. SNVT P2JJ METRO MAKASAR
No.
Kegiatan/Sub Kegiatan/Paket
AU/K/S
F/N
Lokasi
Sasaran
Pagu (x 1000)
Sumber Dana
K/L/P

Nilai Swa/Kontrak (x 1000)

Prog. Keu (x 1000)
Progress (%)
KET
Vol
Satuan
RPM
PLN
Total
RPM
PLN
Total
RPM
PLN
Keu
Fisik
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
SNVT P2JJ METRO MAKASAR P 3.740.446,00 0,00 3.740.446,00 - - - 3.039.090,60 0,00 81,25 99,18
0001 ADMINISTRASI UMUM AU N 580.072,00 0,00 580.072,00 GOI 580.072,00 0,00 580.072,00 384.212,78 0,00 66,24 66,24
4346 PERENCANAAN DAN PENGAWASAN TEKNIS JALAN DAN JEMBATAN                          
0002 ADMINISTRASI KEGIATAN                          
- ADMINISTRASI KEGIATAN S N MAKASSAR 1 PAKET 395.550,00 0,00 395.550,00 GOI - 395.550,00 0,00 395.550,00 357.521,19 0,00 90,39 95,27
0041 SURVEY, PEMETAAN, MASTER PLAN, STUDI KELAYAKAN DAN PENATAGUNAAN TANAH                          
- LEGER JALAN DAN SURVEY BMS K N MAKASSAR 1 PAKET 350.000,00 0,00 350.000,00 GOI K 253.627,00 0,00 253.627,00 253.627,00 0,00 72,46 100,00
0054 PENYUSUNAN DETAIL DESAIN                          
- PERENCANAAN TEKNIS JALAN MAKASSAR-MAROS K N MAKASSAR-MAROS 1 PAKET 370.000,00 0,00 370.000,00 GOI K 341.852,50 0,00 341.852,50 341.852,50 0,00 92,39 100,00
- PERENCANAAN TEKNIS JEMBATAN MAROS K N MAROS 1 PAKET 470.000,00 0,00 470.000,00 GOI K 366.272,50 0,00 366.272,50 366.272,50 0,00 77,93 100,00
0117 PERENCANAAN/ IMPLEMENTASI/ PENGELOLAAN SISTEM AKUNTANSI PEMERINTAH                          
- PENGELOLAAN SISTEM AKUNTANSI (SAI) S N MAKASSAR 1 PAKET 58.550,00 0,00 58.550,00 GOI - 58.550,00 0,00 58.550,00 56.397,58 0,00 96,32 96,32
0121 PENGAWASAN/SUPERVISI KONSTRUKSI                          
- PENGAWS. TEKNIS PEMB. JL DAN JEMBT. METROPOLITAN MKSR (PENGAWS. JL. PERINTIS KEMERDEKAAN) K N MAKASSAR 1 PAKET 710.576,00 0,00 710.576,00 GOI K 608.443,00 0,00 608.443,00 608.443,00 0,00 85,63 100,00
- PENGAWASAN TEKNIS PEMBANGUNAN URIP SUMOHARJO FLY OVER (FO) K N MAKASSAR 1 PAKET 615.698,00 0,00 615.698,00 GOI K 615.698,00 0,00 615.698,00 491.048,23 0,00 79,75 100,00
0272 PENGADAAN PERLENGKAPAN SARANA GEDUNG                          
- PENGADAAN PERLENGKAPAN SARANA GEDUNG S N MAKASSAR 1 UNIT 3.500,00 0,00 3.500,00 GOI - 3.500,00 0,00 3.500,00 3.500,00 0,00 100,00 100,00
0273 PENGADAAN MEUBELAIR                          
- PENGADAAN MEUBELAIR S N MAKASSAR 23 UNIT 24.000,00 0,00 24.000,00 GOI - 24.000,00 0,00 24.000,00 23.995,00 0,00 99,98 100,00
0277 PENGADAAN ALAT PENGOLAH DATA                          
- PENGADAAN ALAT PENGELOLA DATA S N MAKASSAR 5 UNIT 62.500,00 0,00 62.500,00 GOI - 62.500,00 0,00 62.500,00 62.240,00 0,00 99,58 100,00
0657 PEMANTAUAN DAN EVALUASI                          
- PEMANTAUAN DAN EVALUASI S N MAKASSAR 1 PAKET 100.000,00 0,00 100.000,00 GOI - 100.000,00 0,00 100.000,00 89.980,83 0,00 89,98 95,07
TOTAL
AU
580.072,00
7.480.892,00
0,00
7.480.892,00
Jumlah Paket Kontrak :
5
SWAKELOLA
2.516.274,00
0,00
2.516.274,00
FISIK
NON FISIK
Jumlah Paket Swakelola :
6
644.100,00
0,00
644.100,00
FK
0
0,00
2.516.274,00
5
NK
Jumlah Paket Fisik :
0
0,00
0
SF
0,00
0,00
0,00
FL
0
0,00
0,00
0
NL
Jumlah Paket Non Fisik :
11
644.100,00
6
SN
3.160.374,00
0,00
3.160.374,00
FP
0
0,00
0,00
0
NP
Ket                
AU
:
Administrasi Umum F
:
Fisik K
:
Kontrak
K
:
Kontrak N
:
Non Fisik L
:
Lelang
S
:
Swakelola       P
:
Persiapan